{"id":5168,"date":"2024-05-28T15:03:37","date_gmt":"2024-05-28T13:03:37","guid":{"rendered":"https:\/\/www.elinmotoren.com\/en\/?p=5168"},"modified":"2024-05-28T15:17:27","modified_gmt":"2024-05-28T13:17:27","slug":"hydropower-project-shkopeti","status":"publish","type":"post","link":"https:\/\/www.elinmotoren.com\/en\/2024\/05\/28\/hydropower-project-shkopeti\/","title":{"rendered":"Modernization of the hydropower station Shkopeti"},"content":{"rendered":"
\n
\n
\n \n\t\t\t
\n\t\t\t\t\"\" <\/div>\n\t\t\t \n\n
\n
\n\t\t\t\t

Modernization of the Shkopeti hydropower station resulted in a 13 percent performance increase<\/h1> <\/div>\n <\/div>\n <\/div>\n<\/div>\n<\/div><\/div>\n\n
\n
\n
\n
\n\t

In a landmark collaboration, Voith Hydro, ELIN Motoren, and Sintaksa have successfully supported the modernization of the Shkopeti hydropower station, significantly enhancing its performance and contributing to Albania’s sustainable energy future. The project, distinguished by cutting-edge technology and meticulous planning, has exceeded customer expectations by achieving a remarkable 13% increase in the station’s performance.<\/p>\n

The modernization project involved integrating Kaplan turbines with a new hydraulic design, a customized foundation frame for the synchronous generator to maximize power output, and dedicated electrical equipment. This comprehensive upgrade ensures the Shkopeti hydropower station operates at peak efficiency, bolstering Albania’s renewable energy supply.<\/p>\n

 <\/p>\n

\"\"<\/p>\n <\/div>\n

\n\t\t

Key highlights of the synchronous generators:<\/strong><\/p>\n